Data Center Critical: the race for electricity behind artificial intelligence, explained by nuclear engineer Joe Miller
AI, power and the U.S.-China race

The AI boom runs on electricity

by Joe Miller

Data centers are the factories of artificial intelligence, and they are hungry for power, water and chips. Here is what's really happening, who's winning, and what it means for your electric bill and your town.

What this site is about

Every time someone asks an AI chatbot a question, a computer in a giant building somewhere does the work. Those buildings are data centers, and the AI race has set off the biggest building boom in their history. Tech companies are spending hundreds of billions of dollars on them. Each new AI campus can use as much electricity as a city, and the power grid was never built for that.

That collision touches almost everyone. It shows up on your electric bill. It decides whether old nuclear plants come back to life. It's on the ballot in small towns. And it sits at the center of the competition between the United States and China, because whoever has the most chips and the most power can build the most capable AI.

Data Center Critical explains all of it in plain English, with diagrams, short videos and real numbers with sources, from someone who spent a career around power plants.

Why it matters to you

Your electric bill

In the 13-state PJM grid, the price utilities pay to keep enough power plants ready went up more than 10 times in two years, and data centers got most of the blame. Here's how a data center far away reaches your meter.

The nuclear comeback

Microsoft, Google, Amazon and Meta have signed close to 10 gigawatts of nuclear deals. Closed plants like Three Mile Island and Duane Arnold are heading back to work.

Elon Musk's bet

Musk built the biggest AI supercomputer in Memphis in months, and now SpaceX wants to launch solar-powered data centers into space. What's real and what's a long shot.

America vs. China

The U.S. leads in the best AI chips. China leads in building power plants fast. Export rules, smuggling and the race for electricity decide who pulls ahead.

Your town

On November 3, voters in about 40 communities moved to limit or pause data centers. Land, water, noise and taxes are now local fights across the country.

The AI boom in numbers

Data centers' share of all U.S. electricityabout 4.4%20239.5%2030 (low)about 11.8%2030 (mid)15.3%2030 (high)Lawrence Berkeley National Laboratory estimates for the U.S. Department of Energy. Roughly double to triple in seven years.
Data centers could use 2 to 3 times their share of U.S. electricity by 2030.
WhatNumberSource
Data centers' share of U.S. electricityabout 4.4% in 2023; 9.5% to 15.3% by 2030Lawrence Berkeley National Laboratory
PJM capacity price, 2024-25 to 2026-27$28.92 to $329.17 per megawatt-dayIEEFA
Added to monthly home billsabout $16 in Ohio, about $18 in western MarylandForbes, IEEFA
Power for one AI server rackabout 120 kW, ten times an ordinary rackIndustry estimates
Power for one ChatGPT questionabout 0.34 watt-hoursOpenAI
Big Tech nuclear dealsclose to 10 gigawattsCompany announcements
Local data center limits, bans or pauses570+ in 46 states (mid-October 2026)Local news tallies

What you'll find here

Plain-English guides

Thirteen topics, each one a short read with diagrams and a table of the key numbers. No jargon, no hype.

Short videos

Two- to four-minute narrated videos for each topic, so you can watch instead of read.

A monthly newsletter

The month's AI, chip and power news on the 1st of every month. Everyone can read a free sample; members get the full issue.

Sources you can check

Every page lists where its numbers come from: the Department of Energy, grid operators, news reports and company filings.

The topics

Seven are free for everyone. Six are for members. New topics are added as they're finished.

FREE

1. Will AI data centers raise your electric bill?

Why bills are climbing in some states, how a data center far away reaches your meter, and what states are doing about it.

🔒 MEMBERS

2. Why Big Tech is buying nuclear power plants

Microsoft, Google, Amazon and Meta are restarting reactors and backing new ones. A nuclear engineer sorts what's real from the hype.

FREE

3. Inside a data center

What happens when you ask AI a question: the buildings, chips, power and cooling behind the answer.

FREE

4. Traffic jam in orbit

A million data center satellites, China's two giant networks, 355,000 collision dodges a year and the risk of a space junk chain reaction.

🔒 MEMBERS

5. Nuclear vs. the alternatives: what should power AI?

Nuclear, gas, solar and batteries, wind, geothermal and the grid compared on cost, reliability, speed and pollution, with a nuclear engineer's verdict.

FREE

6. The chip war

How tiny chips became a national security issue: Nvidia, Taiwan, export bans and smuggling.

🔒 MEMBERS

7. Can China win at AI without America's best chips?

DeepSeek, cheaper models, and whether the export bans are working.

FREE

8. The AI race is really a power race

Who can build power plants fast enough, and why it may decide the winner.

🔒 MEMBERS

9. Water: the hidden cost of AI

How much water a data center needs, where it comes from, and the alternatives.

FREE

10. Where America's AI is being built, state by state

Virginia, Texas, Ohio, Georgia and more: the towns winning jobs and the towns saying no.

🔒 MEMBERS

11. China builds power plants fast

China's pace on power and nuclear, and what America would have to change to keep up.

FREE

12. Elon Musk, Colossus and data centers in space

The world's biggest AI supercomputer in Memphis, the gas turbine fight, and SpaceX's plan to launch solar-powered data centers into orbit.

🔒 MEMBERS

13. What happens to AI in a blackout, an EMP or a war?

Data centers as targets, grid attacks, Taiwan, and the backup power behind the cloud.

Members: $15 a month

Half the topics are free. Members get the other half, plus the monthly Data Center Critical newsletter with the month's AI, chip and power news. Cancel anytime.

Join for $15/month

Who's writing this? I'm Joe Miller, a nuclear engineer. I spent my career around power plants, so when the AI boom turned into a race for electricity, I started digging. This site explains what I've found in plain English. My story is at criticalmassbook.com.

The monthly newsletter

One issue a month: the biggest AI and data center news, the power picture, the U.S.-China chip race, a data center of the month, and what it means for your bill. Members get the full issue on the 1st of every month; everyone can read a free sample. Read a free sample · See what's in it · Past issues

Plain-English explainer by Joe Miller, a nuclear engineer. Not investment advice. Figures are the latest public numbers we could find and change fast; sources are at the bottom of each page.